|
I-70/71 South Innerbelt Design Enhancement
Columbus, Ohio
- The Ohio Department of Transportation is conducting a study of the I-70/71 corridor in downtown Columbus. This study will guide the $525 million dollar rebuild of the corridor that is expected to begin construction in 2011.
- MSI worked to create a Design Enhancement Plan that heals the urban fabric that was severely damaged as a result of the original construction of the highway.
|